WK Yuletide Group - Replacement of electrical system for Xmas lights
Summary
Description
The project is in two parts.
A. Recabling of internal power sources from the consumer unit in each of 6 premises (4 studios, 1 commercial business and the Village Hall) with armoured cabling to an external waterproof junction box. All work to be carried out by certified electrician including testing.
B. Replacement of external wall cabling, installation of weatherproof sockets and connection to newly installed weatherproof junction boxes for 34 motif positions in Ritchie Street and Main Street. All work to be carried out by NAC Buliding Services.
Breakdown of costs (including VAT)
A. £2400
B. £2000
Total £4400
Note: This application is for £1000 which is a proportion of the total above, we are trying to find the remainder from other sources.
It would be a shame if the money could not be raised to provide Xmas lights
It would be a shame if the money could not be raised to provide Xmas lights